Results 1 to 5 of 5
  1. #1
    Join Date
    Mar 2011
    Posts
    191

    Default CSA BFVS Remodeling

    Does anyone know if the BFVS are also being remodeled?? Or is it just the older GVS? We are heading back Aug. 2014 (trip #4) for our 25th Anniversary and Vow Renewal. This is our favorite room category so it would be wonderful if they will be updated by then. Thanks!

  2. #2
    Join Date
    Jun 2009
    Posts
    1,036

    Default

    The BFVS are also being renovated along with the OVS rooms too!

  3. #3
    Join Date
    Jul 2009
    Posts
    954

    Default

    We were just there 10/23-10/29 and the first of the 3 story buildings along the beach were being worked on. Looks mostly cosmetic with bathroom upgrade. Had to laugh as a worker on the third floor was on the beach side of the railing hanging on with one hand and sanding it down with the other.

  4. #4
    Join Date
    Mar 2011
    Posts
    191

    Default

    That's great news. Hope our 2 favorite rooms are done!! Sure hope they do something about the bathroom lighting while they're doing the updates. Aug. 16th here we come!

  5. #5

    Default

    Does anyone have new pics to post? Yes, the lighting could use an upgrade as well.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •